Description: Construction of the Culvert at km12+277 in Section 4, Overpass at km6+972 in Section 5, and Retaining Wall from km5+505 to km5+730 in Section 5, as well as Retaining Wall from km11+200 to km11+498 in Section 3.

Period: 11.2024 – 05.2025