Description: Construction of the river intake (diversion structure) and sediment trap, construction of access roads, pipeline installation L=1998.56m (DN400, PN 6 to PN16) with all designed structures as air valves shafts, wash out shafts , anchors blocks and construction of the power plant. Installed power capacity 153kW.