Description: Rehabilitation of supply pipeline for SHPP 4 (from SHPP 3 to transition chamber) in length of 114m with replacement of polyethylene pipes with GRP pipes diameter DN1400 and construction of concrete stabilization for protection from high groundwater and the impact of the river Luda Mara under which it passes this section

Period: 08.2021- 10.2021