Description: Construction of the Main pipeline Udovo – Straishte (GRP pipeline DN1700-DN1500), as part of the Irrigation system South Vardar Vallay, Phase 2 (Valandovo Irrigation system), as sub-contractor
Period: 10.2020 – 04.2021




Description: Construction of the Main pipeline Udovo – Straishte (GRP pipeline DN1700-DN1500), as part of the Irrigation system South Vardar Vallay, Phase 2 (Valandovo Irrigation system), as sub-contractor
Period: 10.2020 – 04.2021



