Description: Construction of the river intake (diversion structure) and sediment trap, construction of access roads, pipeline installation L=2540.30m (DN500, PN 6 to PN16) with all designed structures as air valves shafts, wash out shafts , anchors blocks and construction of the power plant. Installed power capacity 306kW.

Period: 01.2021-09.2022