Description: Construction of the river intake (diversion structure) and sediment trap, construction of access roads, pipeline installation L= 3087m (DN600, PN 6 to PN20) with all designed structures as air valves shafts, wash out shafts, anchors blocks and construction of the power plant. Installed power capacity 685 kW.
Period: 08.2016-03.2019