Description: Construction of the river intake (diversion structure) and sediment trap, construction of access roads, pipeline installation L= 1456m (DN500 to DN600, PN 6 to PN20) with all designed structures as air valves shafts, wash out shafts, anchors blocks and construction of the power plant. Installed power capacity 500kW.
Period: 08.2016-06.2019