Description: Construction of the river intake (diversion structure) and sediment trap, construction of access roads, pipeline installation L= 1914m (DN600, PN 6 to PN32) with all designed structures as air valves shafts, wash out shafts, anchors blocks and construction of the power plant. Installed power capacity 950kW.
Period: 08.2016-06.2019