Description: Construction of the river intake (diversion structure) and sediment trap, construction of access roads, pipeline installation L= 2335  m (DN800 to DN700 and PN 6 to PN20) with all designed structures as air valves shafts, wash out shafts, anchors blocks and construction of the power plant. Installed power capacity 960kW.

Period: 05.2016-07.2017